1 2 3 4
Auditorium Renovation- Public School IS 238
Hollis, NY


The 600 seat auditorium at IS 238 was completely renovated. Since the existing geometry and low ceiling were causing distinct echoes, a major component of this project was to improve the audibility of the space. The ceiling was modified to provide volume to the room, while other improvements included the restoration of seats and finishes, improvements to the house lighting system, and the repair of the stage rigging system.